PROJECTS
- Tangguh EGR/CCUS
- Gundih CCUS/CO2-EGR
- Sukawati CO2-EOR
- CCS Sukakemang
- Abadi CCS/CCUS
- Joint Study Blue Ammonia & CCS in Central Sulawesi
- East Kalimantan CCS/CCUS Study
- Study of CCUS for Coal to DME
- Arun CCS
- Ramba CCUS (CO2-EOR)
- Central Sumatera Basin CCS/CCUS Regional Hubs
- East Kalimantan & Sunda Asri Basin - CCS/CCUS Regional Hubs
- CO2 Capture & Utilization to Methanol - RU V Balikpapan
- CCUS Study
- Pilot Test CO2 Huff and Puff Jatibarang
Coducted By
bp Berau ltd., study was conducted by CoE-ITB
Status
Feed Preparation POD Ubadari and Vorwata EGR/CCUS has been approved
On Stream Target Schedule
2026/2027
CO2 Stored Potential
25 to 33 million tCO2 for 10 to 15 years
Coducted By
Pertamina, CoE ITB, JGC, J-Power, JANUS & Supported by METI Japan
Status
Phase-2 Study to mitigate uncertainties & risks
On Stream Target Schedule
2026
CO2 Stored Potential
3 million tCO2 for 10 yrs
Coducted By
Pertamina, LEMIGAS, JAPEX & Supported by METI Japan
Status
Subsurface Study by Pertamina Study CO2-EOR as CCUS by Pertamina, LEMIGAS, JAPEX
On Stream Target Schedule
Pilot Test 2026-2027 Full Scale: 2031
CO2 Stored Potential
7 to 14 million tCO2 for 1 yrs (base case 10 milliontCO2)
Coducted By
Repsol Sakakemang B.V.
Status
Site selection & characterization Preparing Lab test for Feasibility
On Stream Target Schedule
2027
CO2 Stored Potential
30 million tons of CO2 emissions for 15 years
Coducted By
Inpex Masela Ltd.
Status
FS with ITB (Completed on July 2022)
On Stream Target Schedule
–
CO2 Stored Potential
70 million ton of Native CC by 2055
Coducted By
Pertamina & PT. Panca Amara Utama, JOGMEC, Mitsubishi, ITB
Status
JSA Finalization Preparing required data by Pertamina
On Stream Target Schedule
FS (July 2023)
CO2 Stored Potential
19 million tCO2 for 20 yrs
Coducted By
PT. Kaltim Parna Industri & ITB
Status
Pre – Feasibility Study (surface facilities)
On Stream Target Schedule
2028
CO2 Stored Potential
10 million tCO2 for 10 years
Coducted By
Pertamina & Chiyoda Corporation
Status
Joint Study Agreement (JSA) has been signed, Preparing access data & CA MoU Carbon Aceh-PEMA has been signed
On Stream Target Schedule
FS (Dec 2023)
CO2 Stored Potential
26 or 131 million tCO2 for 2 years, depends on scenario
Coducted By
Carbon Aceh & PEMA
Status
Preparing for Joint Feasibility Study (Expected to be started in 2022)
On Stream Target Schedule
2028
CO2 Stored Potential
–
Coducted By
Pertamina
Status
Internal study
On Stream Target Schedule
2030
CO2 Stored Potential
–
Coducted By
Pertamina & Mitsui
Status
Preparing required data & CA
On Stream Target Schedule
2028
CO2 Stored Potential
–
Coducted By
Pertamina & ExxonMobil
Status
Subsurface Evaluation
On Stream Target Schedule
2028
CO2 Stored Potential
–
Coducted By
Pertamina & Air Liquide
Status
JSA has been signed, Joint Study until 2023
On Stream Target Schedule
2028
CO2 Stored Potential
–
Coducted By
Pertamina & Chevron
Status
Discussion on field candidate, preparing JSA
On Stream Target Schedule
–
CO2 Stored Potential
–
Coducted By
Pertamina & Region 2 – Zona 7
Status
Validating the simulation result & preparing injection well, JSA with JOGMEC has been signed
On Stream Target Schedule
Pilot Test W4 Oct 2022
CO2 Stored Potential
–