PROJECTS

Coducted By

bp Berau ltd., study was conducted by CoE-ITB

Status

Feed Preparation POD Ubadari and Vorwata EGR/CCUS has been approved

On Stream Target Schedule

2026/2027

CO2 Stored Potential

25 to 33 million tCO2 for 10 to 15 years

Coducted By

Pertamina, CoE ITB, JGC, J-Power, JANUS & Supported by METI Japan

Status

Phase-2 Study to mitigate uncertainties & risks

On Stream Target Schedule

2026

CO2 Stored Potential

3 million tCO2 for 10 yrs

Coducted By

Pertamina, LEMIGAS, JAPEX & Supported by METI Japan

Status

Subsurface Study by Pertamina Study CO2-EOR as CCUS by Pertamina, LEMIGAS, JAPEX

On Stream Target Schedule

Pilot Test 2026-2027 Full Scale: 2031

CO2 Stored Potential

7 to 14 million tCO2 for 1 yrs (base case 10 milliontCO2)

Coducted By

Repsol Sakakemang B.V.

Status

Site selection & characterization Preparing Lab test for Feasibility

On Stream Target Schedule

2027

CO2 Stored Potential

30 million tons of CO2 emissions for 15 years

Coducted By

Inpex Masela Ltd.

Status

FS with ITB (Completed on July 2022)

On Stream Target Schedule

CO2 Stored Potential

70 million ton of Native CC by 2055

Coducted By

Pertamina & PT. Panca Amara Utama, JOGMEC, Mitsubishi, ITB

Status

JSA Finalization Preparing required data by Pertamina

On Stream Target Schedule

FS (July 2023)

CO2 Stored Potential

19 million tCO2 for 20 yrs

Coducted By

PT. Kaltim Parna Industri & ITB

Status

Pre – Feasibility Study (surface facilities)

On Stream Target Schedule

2028

CO2 Stored Potential

10 million tCO2 for 10 years

Coducted By

Pertamina & Chiyoda Corporation

Status

Joint Study Agreement (JSA) has been signed, Preparing access data & CA MoU Carbon Aceh-PEMA has been signed

On Stream Target Schedule

FS (Dec 2023)

CO2 Stored Potential

26 or 131 million tCO2 for 2 years, depends on scenario

Coducted By

Carbon Aceh & PEMA

Status

Preparing for Joint Feasibility Study (Expected to be started in 2022)

On Stream Target Schedule

2028

CO2 Stored Potential

Coducted By

Pertamina

Status

Internal study

On Stream Target Schedule

2030

CO2 Stored Potential

Coducted By

Pertamina & Mitsui

Status

Preparing required data & CA

On Stream Target Schedule

2028

CO2 Stored Potential

Coducted By

Pertamina & ExxonMobil

Status

Subsurface Evaluation

On Stream Target Schedule

2028

CO2 Stored Potential

Coducted By

Pertamina & Air Liquide

Status

JSA has been signed, Joint Study until 2023

On Stream Target Schedule

2028

CO2 Stored Potential

Coducted By

Pertamina & Chevron

Status

Discussion on field candidate, preparing JSA

On Stream Target Schedule

CO2 Stored Potential

Coducted By

Pertamina & Region 2 – Zona 7

Status

Validating the simulation result & preparing injection well, JSA with JOGMEC has been signed

On Stream Target Schedule

Pilot Test W4 Oct 2022

CO2 Stored Potential